Operational Readiness consultants who run your plant from day one.

HolisticAM plans and builds operational readiness for new and expanding mineral processing plants: the readiness framework, the maintenance strategy, the asset register, the CMMS master data, the spares and the work management your operating team needs at first ore. One independent crew from the design drawings to a loaded CMMS. Most consultants hand you one half or the other.

Operational readiness for gold and mineral processing plants, in West Africa and across Australia.

ISO 55001 aligned
Certified Apollo RCA trainers
Sole ANZ ReliaSoft distributor
Tier 1 gold & processing assets
The capability test

Choosing an operational readiness partner: one question separates them

Ask any operational readiness bidder two things: who they answer to, and who is still on site at first ore. An EPCM assessing readiness is grading its own construction. A large advisory firm can build the maintenance system, but usually across a scope seam and alongside a platform it implements.

The gap that decides your first year is not capability, it is independence and continuity. A readiness plan handed across a scope seam does not survive first ore.

HolisticAM covers the full span independently. We author the asset-management and reliability frameworks and build the maintenance system underneath them: the asset register, the maintenance strategy, the CMMS master data, the spares and the work management that let the operating team run the plant on day one. We answer to the operator, not to the build. When you scope a partner, ask who it answers to. The answer tells you who can carry the risk.

“A readiness plan is only worth the maintenance system built underneath it. If the CMMS is empty on day one, the plan was never real,” said Dave Alexander, Managing Director, HolisticAM.

When a West African gold developer put a full readiness scope to market, HolisticAM won it head-to-head against a global advisory firm, on independence and specialist depth. Both firms bid the full scope. Narrative anonymised.
Why timing decides it

When should operational readiness start? At design, with construction

Start readiness at design and the maintenance system is ready when the plant is. Leave it to commissioning and the operating team inherits a plant it cannot yet maintain.

Design

Drawings, equipment lists

Construction

Build and install

Commissioning

Systems energised

First ore

Ramp to nameplate
Operational readiness — strategy, data, spares, work managementRuns day one

The maintenance strategy and CMMS data are built from the design drawings while construction runs, so day one is a planned operation.

The level of influence

Your ability to shape cost and reliability is highest at design and falls with every phase the project completes. A readiness decision deferred to commissioning is influence you have already spent. That is why we start at the drawings, not the handover.

Level of influence over a project: highest at design, falling through to operations

Reproduced from the HolisticAM Operational Readiness “Level of Influence” framework. The earlier you engage, the more influence you hold over cost and reliability.

What it covers

Operational readiness scope: six streams, from design drawings to first work order

Operational readiness spans the whole project: people, safety, operations, procurement, commissioning and asset management. We author the full framework across those domains, and build the asset and maintenance streams that carry the most start-up risk.

Asset management & reliability architecture

Built from your objectives, needs and direction: the asset-management and reliability frameworks, the policies and procedures, the Strategic Asset Management Plan (SAMP) and the supporting Asset Management Plans (AMPs), aligned to the ISO 55000-series standard. The foundation the rest of the build sits on.

Maintenance strategy

Built from the design, asset by asset, before the equipment arrives.

Asset register and hierarchy

Structured for the CMMS, aligned to the functional locations.

CMMS master data

Built and loaded before start-up, so the team opens work orders on day one, not month six.

Maintenance plans, spares and materials

Defined, costed and ready to procure.

Work management and roles

Set up so the team runs a planned operation, not a firefight.

New to the topic? Read the plain-English guide: What is Operational Readiness? For the mining-specific detail, see our full guide to operational readiness for mining assets. If you are weighing scope, maintenance readiness vs operational readiness sets out exactly where the line falls, and the operational readiness framework explains the governance that holds the streams together.

Readiness in numbers

Operational readiness deliverables: a build, not a binder

353
Planned routine tasks written before start-up
23
Asset lines structured into the hierarchy
9
SAP-ready deliverable types
12
Week pre-commissioning build to a loadable CMMS

On a recent iron-ore plant, HolisticAM built 353 planned routine tasks across 23 asset lines as 9 SAP-ready deliverable types, in a 12-week pre-commissioning programme delivered CMMS-ready.

Free readiness scorecard

Know where your project actually sits

The free Readiness Scorecard takes about 10 minutes, self-serve. Score your project across the nine readiness areas, from organisational readiness through to supply chain and compliance, and see the result banded against your first ore date. The score shows on the page; the board pack is optional.

Score your readiness
Free. Self-serve. About 10 minutes. Or read the full 27-checkpoint checklist first.
Proof

Operational readiness delivered before first ore

Anonymised by client agreement.

West African greenfield

Gold plant, first ore 2026

We authored the operational readiness plan and built the maintenance system that delivers it, then mobilised the operating and maintenance teams ahead of start-up. Same region, same asset class, same scope a new build faces today.

Framework authorship

The OR standard for a major greenfield

We wrote the operational readiness standard a large gold project is being delivered under, aligned to ISO 55001. The framework governs how readiness is scoped, gated and assured across the build.

Brownfield expansion

Expansion readiness on a live plant

Readiness for an expansion tie-in where the new circuit had to reach nameplate without dragging down the running operation.

Track record

Trusted on Tier 1 mining assets

Barrick Gold
Citic Pacific Mining
Glencore
Orica
Montage
Endeavour
Lloyds

Selected HolisticAM clients across Tier 1 mining and mineral processing.

The standard

ISO 55001 operational readiness that stands up to audit

ISO 55001 is the line between a readiness plan that reads well and one a procurement analyst can defend. We build readiness against that standard from the start, so the framework you commission is the one your future audit, financier and board already recognise.

Built in the early project phases— from the design drawings

Asset management & reliability architecture

ISO 55000-series aligned
  • Objectives, needs & direction
  • AM & reliability frameworks
  • Policies & procedures
  • SAMP & Asset Management Plans

Maintenance & operations build

Loaded to CMMS / ERP
  • Asset register & hierarchy
  • Maintenance strategy & PMs
  • Spares, materials & BOMs
  • Work instructions & procedures
Day one: operate & maintainSafely, reliably and planned — not reactive
Aligned to ISO 55001, and sustained into operations as a managed reliability service.

How HolisticAM operational readiness builds day-one capability, before first ore.

Recognised, not house-brand

The readiness scope maps to a recognised standard, not a method only we use.

Survives due diligence

The maintenance data and strategy are structured to hold up under scrutiny.

Assured handover

Operations receive an assurance trail, not just a document set.

Free readiness scorecard

Know where your project actually sits

The free Readiness Scorecard takes about 10 minutes, self-serve. Score your project across the nine readiness areas, from organisational readiness through to supply chain and compliance, and see the result banded against your first ore date. The score shows on the page; the board pack is optional.

Score your readiness
Free. Self-serve. About 10 minutes. Or read the full 27-checkpoint checklist first.
How an engagement starts

The operational readiness process: Diagnostic, Blueprint, Build & Assure

You do not commit to the full build to find out if we fit. Readiness starts with a defined, fixed-scope diagnostic.

1

Readiness diagnostic

A fixed-scope assessment of where your project sits against a start-up-ready plant, and the gap to close. Priced and bounded. See how the diagnostic works.

2

Readiness blueprint

The framework, scope and plan to first ore, aligned to ISO 55001 and your stage gates.

3

Build and assure

We build the maintenance system and assure it to handover, so the operating team runs from day one.

West African engagements are contracted and staged accordingly, with milestone payments matched to delivery.

Where we deliver

Australian consultants to a West African build

Many of the gold projects building in West Africa run study management and procurement from Perth and Melbourne. You get a partner in your head-office timezone who has already mobilised readiness on a West African plant.

MaroochydoreQueensland Head Office
PerthWestern Australia
NewcastleNew South Wales
Sole ANZ ReliaSoft distributorReliability analytics
Certified Apollo RCA trainersAustralia-wide
ISO 55001Frameworks authored to the standard
Leadership from BHP, Rio Tinto, Alcoa, MMGOperators, not theorists
MD: Master of Maintenance & ReliabilityChaired the Victorian Asset Management Council
Credentials

The team behind the framework

HolisticAM is Australia’s leading reliability consultancy. Our people build maintenance systems for a living, which is why our readiness work ends in a running plant rather than a report.

Questions

Operational readiness, answered

What does an operational readiness consultant actually deliver?
A readiness framework and the maintenance system that delivers it: maintenance strategy, asset register, CMMS master data, spares, work management and readiness assurance, built before the plant starts.
Why HolisticAM over a Big 4 or EPCM firm?
A Big 4 firm can build the maintenance system, but usually across a scope seam and alongside a platform it implements; an EPCM assessing readiness is grading its own construction. HolisticAM is independent, vendor-neutral, and keeps one crew on the scope from the frameworks to a loaded CMMS. When a global advisory firm bid the same full scope against us, the developer chose independence and specialist depth. Compare the three delivery routes.
Can you build the CMMS and maintenance data before plant start-up?
Yes. We build and load the asset register, hierarchy, maintenance plans and master data before first ore, so the operating team opens planned work orders from day one.
How are engagements scoped and contracted, including in West Africa?
Readiness starts with a fixed-scope diagnostic, then a blueprint, then the build. West African engagements are contracted and staged with milestone payments matched to delivery.
Do you work on West African gold projects?
Yes. We have authored and built operational readiness for a West African greenfield gold plant, and we deliver from Australian offices in the same timezone as most of the ASX-listed owners building there.
How does your work relate to ISO 55001?
We author readiness frameworks to ISO 55001 and structure the maintenance data and assurance trail to match, so the framework holds up in audit and due diligence.
When should operational readiness start?
At design, not at commissioning. The maintenance strategy and data are built from the design drawings while construction runs, which is what lets a plant ramp on plan. Our full 27-checkpoint readiness checklist sets out the date each checkpoint must be complete, counted back from first ore.

Scoping readiness for a new build or expansion?

Tell us where your project is: study, FID, construction or pre-start. We will show you what readiness has to cover by then, and where the risk sits if it does not.

First step is a fixed-scope readiness diagnostic. No open-ended commitment.