Select Page

Komatsu 930E Maintenance Strategy Optimisation

Industry: Mining Sector

Services Required: Maintenance Strategy Optimisation, FMECA

Location: Australia 

The Komatsu 930E Electric Drive Haul Truck has been has been used by the client to remove overburden across multiple open cut mines in Australia.

The client had identified that their 930E fleet had not achieved their forecast availability with numerous major component failures increasing the burden on maintenance teams. Holistic Asset Management (HolisticAM) was engaged by the mining company to undertake a holistic review their fleet of Komatsu 930E Electric Drive Trucks from a maintenance perspective.

The objective of this project was to understand key drivers for unavailability, identify recommendations and assist with the implementation by working closely with site and corporate key stakeholders.

The project utilised a hybrid onsite-offsite execution approach and was delivered on time and within budget. The HolisticAM team remained engaged post strategy implementation to evaluate it’s effectiveness.

THE CHALLENGE

Leveraging our OEM and site-based experience we understand the challenges that mining companies face. The client had a FMECA based maintenance strategy for the truck, however was experiencing significant unplanned failures. During planned maintenance (PM) services defects were often detected when close to failure resulting in significant maintenance over runs. Over runs combined with unplanned failures resulted in a significant maintenance burden on the maintenance teams. This posed additional challenges including:

  • Uncertainty in the quality of the preventive maintenance strategy (particularly associated with on-condition tasks and planned component changeouts)
  • Unknown maintenance efficiency of the maintenance execution team

The client had also indicated that the current tactics had diverted from the FMECA.

THE SOLUTION

The client chose HolisticAM based on their OEM, condition-monitoring expertise, on-site experience and proven track of delivering results in the mining industry.

As with all projects executed by HolisticAM, our methodical approach includes identifying the current state, identify and review opportunities for improvement and presenting these opportunities to the client for consideration.

HolisticAM worked closely with the client’s engineering, planning and maintenance execution team to undertake the following reliability engineering tasks:

  • Downtime Data Analysis to determine systems, subsystems and maintainable items that contributed to unplanned maintenance on the trucks
  • Life Data Analysis (LDA) / Weibull was undertaken to determine the Failure Characteristics, Mean Time Between Failure (MTBF) and reliability.
  • Review of service day maintenance execution across all the maintenance crews
  • Review of Mean Time to Repair (MTTR) to identify maintenance efficiency
  • Identification of truck upgrades released by the OEM and implemented by other sites to reduce unplanned failures and improve component reliability
  • Developing proposals using Net Present Value methodology to justify the implementation of machine upgrades with a focus to reduce total cost of ownership

THE RESULTS

Key deliverables included:

  • Updated FMECA-based maintenance strategy
  • Revised service sheets
  • Improvements on PM service-day maintenance execution
  • Recommendations to reduce MTTR
  • Truck upgrade/improvement documentation detailing priority and value add to the business

“HolisticAM has been pivotal in transforming how we undertake maintenance on our assets. Their product knowledge, professionalism and their site experience sets them apart”

Engineering Manager

Added Value

HolisticAM was able to create value by:

  • Over the next 6 months each trucks available time had increase by 112 hours.
  • Increase in fleet availability and MTBF > 90 hours consistently
  • Decrease in MTTR by decreasing time to identify, acknowledge, repair and verify.
  • FMECA-based maintenance strategy with tasks focusing on preventive maintenance to ensure machine issues are detected in a proactive manner

Need Help?

If you want to know more about this project or would like to discuss anything relating to Maintenance Management, don’t hesitate to talk to us!

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

Reliability Engineering Training at Newcrest Lihir

Caterpillar 793D Operation Readiness

Caterpillar 793D Operation Readiness

Caterpillar 994K Loader FMECA Maintenance Strategy Development

Caterpillar 994K Loader FMECA Maintenance Strategy Development

P&H 4100XPC Maintenance Strategy Optimisation

P&H 4100XPC Maintenance Strategy Optimisation

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Caterpillar Dozer Final Drive Root Cause Analysis

Caterpillar Dozer Final Drive Root Cause Analysis

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Engine Life Extension

Komatsu 930E Engine Life Extension

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Availability Simulation Modelling to Identify Future Performance Level

Availability Simulation Modelling to Identify Future Performance Level

Improved Spares Inventory by Optimising Bill of Materials in SAP

Improved Spares Inventory by Optimising Bill of Materials in SAP

Maintenance Master Data Optimisation in SAP

Maintenance Master Data Optimisation in SAP

RAM Model Used to Optimise Light Rail Asset Class Strategies

RAM Model Used to Optimise Light Rail Asset Class Strategies

Asset Management Plans Development at VicTrack

Asset Management Plans Development at VicTrack

Develop a Diesel Generator AMP for Yarra Valley Water

Develop a Diesel Generator AMP for Yarra Valley Water

Asset Management Situational Analysis at Onslow Salt

Asset Management Situational Analysis at Onslow Salt

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Citic Pacific Mining SAP® Work Manager Support

Citic Pacific Mining SAP® Work Manager Support

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Snowy Hydro Asset Management Plans & Dashboards

Snowy Hydro Asset Management Plans & Dashboards