Holistic Asset Management (HolisticAM) engaged with a mining company – Citic Pacific Mining – to provide a detailed assessment of the implemented SAP® Work Manager, a comprehensive mobile solution for the automation of asset management and field service processes.

The objectives of this project were to deliver SAP® Work Manager support as a part of a broader HME improvement project.

THE CHALLENGE

CITIC Pacific Mining’s (CPM) Sino Iron project at Cape Preston is located 100km south west of Karratha, in Western Australia’s resource rich Pilbara region and is the largest magnetite mining and processing operation in Australia. The client needed SAP® Work Manager support as a part of a broader HME improvement project.

THE SOLUTION

HolisticAM provided a detailed assessment of the implemented SAP® Work Manager, a comprehensive mobile solution for the automation of asset management and field service processes.

The assessment was conducted by utilising a structured process consisting of organisational interviews covering 9 elements of work management principals, analysis for transactional and configuration SAP data and general observations.

HolisticAM mobilised senior asset management consultants to conduct the assessment that required:

  • Work management observations at site
  • Work function interviews
  • Work management questionnaires
  • SAP transactional data review and analysis
  • SAP master data (maintenance strategies, task lists, Bom’s, etc) review and analysis

THE RESULTS

All personnel interviewed and otherwise involved in supporting or assisting in the assessment, were candid, honest, and forthcoming. Most employees were committed to a higher standard of excellence and aspire to change. They firmly believe that a strong partnership between Maintenance and Operations will generate a multiplier effect on performance and they expressed a sincere desire to make improvements to become the benchmark across the organisation.

Key deliverables included:

  • Compiled raw information resulting from data analysis, interviews and workshops
  • A detailed report providing insight and reports on asset management maturity as it relates to:
    • The organisation
    • Work management
    • Maintenance strategies
    • Performance measures

The maturity assessment was completed against the “9 Elements” of the work management process. This resultant report detailed the level of maturity along with the issues related to each subject and the proposed project works to close the gap to the required level of maturity. The assessment was completed against 5 levels of maturity

 

Need Help?

If you need support for SAP Work Management Assessment or you would like to discuss anything relating to Maintenance Management, don’t hesitate to talk to us!

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

Reliability Engineering Training at Newcrest Lihir

Caterpillar 793D Operation Readiness

Caterpillar 793D Operation Readiness

Caterpillar 994K Loader FMECA Maintenance Strategy Development

Caterpillar 994K Loader FMECA Maintenance Strategy Development

P&H 4100XPC Maintenance Strategy Optimisation

P&H 4100XPC Maintenance Strategy Optimisation

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Caterpillar Dozer Final Drive Root Cause Analysis

Caterpillar Dozer Final Drive Root Cause Analysis

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Engine Life Extension

Komatsu 930E Engine Life Extension

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Availability Simulation Modelling to Identify Future Performance Level

Availability Simulation Modelling to Identify Future Performance Level

Improved Spares Inventory by Optimising Bill of Materials in SAP

Improved Spares Inventory by Optimising Bill of Materials in SAP

Maintenance Master Data Optimisation in SAP

Maintenance Master Data Optimisation in SAP

RAM Model Used to Optimise Light Rail Asset Class Strategies

RAM Model Used to Optimise Light Rail Asset Class Strategies

Asset Management Plans Development at VicTrack

Asset Management Plans Development at VicTrack

Develop a Diesel Generator AMP for Yarra Valley Water

Develop a Diesel Generator AMP for Yarra Valley Water

Asset Management Situational Analysis at Onslow Salt

Asset Management Situational Analysis at Onslow Salt

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Citic Pacific Mining SAP® Work Manager Support

Citic Pacific Mining SAP® Work Manager Support

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Snowy Hydro Asset Management Plans & Dashboards

Snowy Hydro Asset Management Plans & Dashboards