Select Page

Asset Availability Simulation Modelling Used to Drive Improved Reliability and Performance

Industry: Transportation – Rolling Stock

Services Required: Reliability Engineering – Availability Simulation Modelling

Location: Victoria, Australia

Holistic Asset Management (HolisticAM) partnered with a Melbourne based public transport service provider to offer Reliability Engineering services for the development and delivery of fleet Availability Simulation Modelling for the client’s light rail fleet. The objective of the availability simulation modelling was to develop with a baseline availability simulation with a high level of accuracy against actual recorded performance measures. With this level of confidence, future performance predictions were made that identified areas of opportunity for improvements to be made with component reliability and overall fleet availabilities.

HolisticAM mobilised a Reliability Specialist to perform work order data cleansing and enrichment, develop and deliver fleet availability simulation modelling by using ReliaSoft Weibull++ & BlockSim. In the wake of travel restrictions, the consultant seamlessly and successfully engaged with key stakeholders via video conferencing tools, assisting the client in predicting, preventing and managing high levels of lifetime engineering uncertainty and risks of failures during the operation.

THE CHALLENGE 

The client required a Fleet Simulation Model that enables future fleet availability results to identify areas of improvement opportunity to drive increased reliability and performance

Support was provided to:

  • Enrich and cleanse the fleet work order data to align to a standard set of failure and cause codes.
  • Develop availability simulation foundation models that provided a high level of accuracy confidence.
  • Apply Repairable System Data Analysis process to measure the failure rates of system components.
  • Identify component restoration factors to improve the accuracy of the RDA analysis. 
  • Predict future performance results of the Fleet Assets through Availability simulation.
availability-simulation-modelling-cumulative-number-of-failure-vs-time

THE SOLUTION – Availability Simulation Modelling

HolisticAM offered two primary Reliability Engineering services in this project to help the client identify the Availability improvement opportunities: 1) Data Cleansing & Analysis, 2) Availability Simulation Modelling.

Once all fleet work order data was enriched, categorised and validated the Reliability Specialist used ReliaSoft Weibull++ & BlockSim Reliability Software to develop simulation models for foundation fleet availability and future period simulations.

The asset Availability Simulation Modelling services consisted of the following tasks:

  • Using ReliaSoft Weibull++ tool to perform Parametric RDA Analysis and identify failure patterns.
  • Developing the historical failure data model which reflects the historical performance of light rail assets.
  • Utilising ReliaSoft BlockSim tool to perform Reliability Block Diagrams modelling and predict forecast modelling results.
  • Developing comparative analysis reporting of the ReliaSoft models.
availability-simulation-modelling-RS-FCI

THE RESULTS

In the wake of travel restrictions (Covid-19), HolisticAM was able to seamlessly and successfully engage with key stakeholders by using Microsoft Teams video conferencing and Teams Channels.

Fleet availability simulation foundation models were created based on the actual fleet failure data. To achieve a high level of accuracy of the model results, a thorough understanding of the customers component repairable process and the quality of overhaul was required. The ReliaSoft modelling developed utilised Repairable Analysis Data over Weibull Analysis to ensure a realistic and high level of confidence of the calculated in the overall availability results. The end result of the simulation models achieved a level of accuracy within 2% of historical performance results.

With the high confidence levels of the accuracy of the modelling, each fleet availability simulations were run for a future 5-year period. These results predicted fleet availability by month for between 2021 and 2025, indicated sub systems that were impacting overall performance and highlighted major downtime periods as a result of component reliability.

Key deliverables for the Availability Simulation Modelling services included:

  • Work Order Data Cleansing and Enrichment
  • Asset Reliability Block Diagrams (RBD)
  • Component Level Weibull Analysis Models (Eta, Beta values)
  • Availability Simulation Models
  • Reports on Future Performance and Impacts
  • Reliasoft Modelling Repositories

Added Value

In this project, HolisticAM used ReliaSoft Weibull++ and BlockSim software to perform the Parametric RDA Analysis & RBD Modelling. These models will be used as fundamental models for future ongoing analysis and improvement. Since the client recognised the functionality of ReliaSoft software, they also embedded the software tools into their reliability program.

Need Help?

If you want to know more about this project or would like to discuss anything relating to Availability Simulation Modelling, don’t hesitate to talk to us!

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Operational Readiness: A New Iron-Ore Crushing & Screening Plant

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Data Driven Maintenance Strategy Improvement at Newcrest Cadia

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

Nickel concentrator Operational Readiness study for a recommissioned nickel concentrator

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

RCM and CHAZOP using ReliaSoft RCM++ for ANSTO Synchrotron Beam Lines

Reliability Engineering Training at Newcrest Lihir

Caterpillar 793D Operation Readiness

Caterpillar 793D Operation Readiness

Caterpillar 994K Loader FMECA Maintenance Strategy Development

Caterpillar 994K Loader FMECA Maintenance Strategy Development

P&H 4100XPC Maintenance Strategy Optimisation

P&H 4100XPC Maintenance Strategy Optimisation

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Hitachi EX5500 / EX5600 Hydraulic Excavator Critical Spares Determination using RBD

Caterpillar Dozer Final Drive Root Cause Analysis

Caterpillar Dozer Final Drive Root Cause Analysis

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Maintenance Strategy Optimisation

Komatsu 930E Engine Life Extension

Komatsu 930E Engine Life Extension

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

FMECA Training and Facilitation to Improve Transport Infrastructure Asset Reliability

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Develop Asset Location Hierarchy and Job Plans with Master Data Governance

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Maintenance Master Data Management in Maximo for Asset Hierarchy Construction

Availability Simulation Modelling to Identify Future Performance Level

Availability Simulation Modelling to Identify Future Performance Level

Improved Spares Inventory by Optimising Bill of Materials in SAP

Improved Spares Inventory by Optimising Bill of Materials in SAP

Maintenance Master Data Optimisation in SAP

Maintenance Master Data Optimisation in SAP

RAM Model Used to Optimise Light Rail Asset Class Strategies

RAM Model Used to Optimise Light Rail Asset Class Strategies

Asset Management Plans Development at VicTrack

Asset Management Plans Development at VicTrack

Develop a Diesel Generator AMP for Yarra Valley Water

Develop a Diesel Generator AMP for Yarra Valley Water

Asset Management Situational Analysis at Onslow Salt

Asset Management Situational Analysis at Onslow Salt

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Barrick Gold Processing Plant Maintenance Review and Risk Assessment

Citic Pacific Mining SAP® Work Manager Support

Citic Pacific Mining SAP® Work Manager Support

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Optimising Fixed Plant Maintenance Strategy for a Mining Company

Snowy Hydro Asset Management Plans & Dashboards

Snowy Hydro Asset Management Plans & Dashboards